Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13603069
| No.13603069
- Product Categories
- Friendly Links
| Information Name: | 2000a-intensive Busway | Compact Busway | Zhenjiang Kim Waugh |
| Published: | 2015-01-12 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Busway closed mold design elements design elements. (1) the combination of segmented mold design, machining and heat treatment both convenient 800a-intensive Busway, Busway closed mold quality assurance, and easy assembly and replacement of the mold. (2) a reasonable choice of clamping clearance primary and secondary die die die body and lower U-shaped groove between the size of the gap is the main factor affecting the accuracy of the workpiece, the greater the gap, the worse the precision parts, but the gap too small will cause difficulties in the draft or make parts surface scratches. Here, the size of the gap is through several tests to determine and repair mode. (3) ensure highly consistent Busway closed mold about two shoulder and lower mold body top surface of the U-shaped groove is essential xlc intensive Busway, and that the left and right shoulder fillet size will directly affect the system pieces of precision and quality, the larger fillets or about shoulder height inconsistent, the more pressure side effect is not ideal, but is too small to make a rounded indentation greater workpiece surface, the design we determined shoulder fillet for R0 .5. (4) Under the phantom with the overall design, both to ensure the precision of the grooves, but also facilitate the realization of its transposition, and, as a result of the lower mold is installed in the bending machine work surface, and therefore it is also easy to install and replace. Busway Busway connecting bracket must be installed securely, busbar shall segmentation number, phase sequence, number, direction and install signs placed correctly when connecting section and section 2000a-intensive Busway, Busway should be aligned with adjacent segments, After connecting busbar conductors and housing should not be subjected to mechanical stress. Connection Setup steps: first check busbar conductors connected at one end face is whether the bump and joint damage, confirming that no harm will begin two sections butt splicer Busway bus conductor busbar should be inserted into the joint is in place to ensure that after the use of a torque wrench locking; butt busway should head part of the end to be connected to the two sections of the bus conductor aligned parallel to each other, then the copper connecting piece and the insulating spacer is inserted busbar ends neutral white (per phase busbars Each clip around a copper connection piece, connecting piece sandwiched between copper put a piece of insulating spacers.) After confirming that no harm, penetrate insulated bolts, and pay attention to copper connecting piece, bus terminals, insulated bulkhead connection holes are aligned, copper connecting piece, insulating spacers if the card in place, tighten the bolts. Bolt tightening torque (M10 bolt torque values ??17.7--22.6NM, M12 bolt torque values ??31.4--39.2NM, M14 bolt torque values ??51.O - 60.8 NM, M16 bolt torque values ??78.5--98.IN.M? ). With O.1 mm feeler intensive Busway, stuffed less than 10mm qualified. Tighten the left and right side and top to bottom cover screws. After Busway whole connection, you must use a multimeter to check the grounding resistance 1Ω stalls, resistance is less than O.1Ω to ensure grounding requirements. 2000a-intensive Busway | Compact Busway | Zhenjiang Kim Waugh Waugh provided by Zhenjiang City Electric Instrument Equipment Co. Zhenjiang City Wal instrument Equipment Co., Ltd. (www.zjjwdy.com) strong, credible, in Zhenjiang, Jiangsu transmission equipment and materials industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Wolfowitz electric meter and you hand in hand into the brilliant, for a better future! |
Admin>>>
You are the 24469 visitor
Copyright © GuangDong ICP No. 10089450, Zhenjiang City, Wal-instrument Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 24469 visitor
Copyright © GuangDong ICP No. 10089450, Zhenjiang City, Wal-instrument Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

