Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13603069
| No.13603069
- Product Categories
- Friendly Links
| Information Name: | Busway manufacturers | Kim Waugh electric meter (certified) | Busway |
| Published: | 2015-04-02 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Aluminum Aluminum Busway Busway Busway line segments can provide a maximum length of 6m, the bending strength to meet the requirements of national standards ZBK36002-89. Using copper conductors within Busway Busway, also according to customer requirements using aluminum conductors, aluminum alloy shell can be used as protective ground conductor, and thus can be used as four-wire Busway Busway use five-wire system. Reinforced aluminum case with aluminum-magnesium alloy shell profiles, from both sides of the plate and the upper and lower cover is made on the side of the heat sink design and dovetail, both conducive to heat Busway, but also strengthened the shell stiffness, also easy to install, while reducing the busbar weight, long-span design and reduce the mounting bracket. Screwless assembly techniques on the shell, under the cover and side connections without screws, rivets and without welding instead of using the hook, groove, not opening due to the housing, water, gas dust get in, to improve the protection level, and looks very beautiful. Busway Busway when mounted vertically mounted vertically intensive Busway, joints vertical distance from the ground should not be less than 0.6m; Busway when mounted vertically between floors, busbar single line length should not exceed 3.6m; monolayer over 3.6 m of floor should be divided over two sections make Busway specifications, should be installed in the middle between layers mounting bracket. Busbar connection point should not wear a floor area, when Busway installation hole through the floor should not have sewage debris into the bus interior. Busway plug-feeding hole (bifurcation interface) should be located in a safe, reliable and easy installation and maintenance positions. After 4--5 layer to be installed; when busbar mounted vertically, you should first spring bracket on the Busway Busway picture, then Busway and spring on the channel bracket holder, spring nut locking bracket , drill down by loosening the nut on, so Busway natural weight carried on the bracket spring. After the busbar connections are tight, its curvature is not greater than 1 degree. Two vertically adjacent busbar mounted, side spacing should not be less than 0.1m. ? Busway laying straight length of more than 60m when setting expansion (expansion) section. Busway manufacturers | Kim Waugh electric meter (certified) | Busway provided by Zhenjiang City Wal instrument Equipment Co., Ltd. Zhenjiang City Wal instrument Equipment Co., Ltd. (www.zjjwdy.com) is a leader in Zhenjiang, Jiangsu Province, transmission equipment and materials over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs . Wolfowitz electric meter in leadership with the staff warmly welcome all inquiries negotiations to create Wolfowitz electric meter a better future. |
Admin>>>
You are the 24469 visitor
Copyright © GuangDong ICP No. 10089450, Zhenjiang City, Wal-instrument Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 24469 visitor
Copyright © GuangDong ICP No. 10089450, Zhenjiang City, Wal-instrument Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

